London Overground disruption this autumn
The North London Line and the Gospel Oak to Barking Line will be shutdown for extended periods this autumn for the enlargement of Hampstead Tunnel and the GOBLIN upgrade.
I've already posted one set of possible alternative arrangements, but the latest Network Rail timetable has a different set which I've attempted to decode below.
- The North London Line will be closed between Willseden Junction and Gospel Oak from September 1st to November 16th. Replacement trains are as follows:
- The Watford DC Line will be diverted to Stratford via Primrose Hill (i.e. Watford-South Hampstead-Camden Road-Stratford), with virtually no trains to Euston. This service runs every 20 minutes.
- Roughly every 15 minutes there'll be a Richmond-Willesden Junction shuttle. The connections at Willesden with the Watford-Stratford service don't look great.
- Twice an hour there'll be a Gospel Oak-Camden Road-Stratford service, at alternating 20 and 40 minute intervals.
- On Sundays, half-hourly Watford-Euston, Richmond-Willesden, Willesden-Stratford and Gospel Oak-Highbury services will run.
- Passengers for the closed stations between Willesden Junction and Gospel Oak are expected to use "adjacent" stations on the Willesden-Queen's Park-Camden Road route, or local buses.
- The Gospel Oak to Barking Line will be closed September 1st-28th with replacement buses running.
- The West London Line appears unaffected.
