Croxley Rail Link soldiers on
Hertfordshire County Council are about to submit a new business case for to the Department for Transport, less than six months after the last one, and three months after that was rejected for not being "compliant". The cost has gone up from £95m to £150m, suggesting the original bid was rejected for underestimating costs.
All they need now if for the DfT to agree to fund the bulk of the cost (£120m), which is exactly the position they've been in since forever. They've received a boost in that the East of England Regional Assembly have given their backing, which may or may not be worth anything.
The scheme is to divert the Metropolitan Line's Watford branch to Watford Junction by building a 500m connecting viaduct to link it up with an mile-and-a-half long disused branch line (pictured), which will need to be rebuilt. The new route includes two new stations. Here's a diagram of all the bits and pieces on Google Maps.
[via uk.transport.london]


