Showing posts with label District Line. Show all posts
Showing posts with label District Line. Show all posts

Friday, 18 July 2008

Photo of new train for District/Circle/H&C/Met

Go here to see what I think is the first actual photo of one of the new S Stock trains. By 2015 these will be running all services on the Circle, District, Hammersmith & City and Metropolitan Lines, with the first in passenger service some time in 2010.

[via District Dave]

Wednesday, 9 July 2008

Death of the Circle Line confirmed

In the latest issue of Modern Railways there's an interview with David Millard, manager of the Circle and Hammersmith & City Lines, discussing the ins and outs of the plans to turn the Circle Line into a Hammersmith-Edgware Road spiral (see diagram). That's right, a senior member of staff has confirmed it on record in a public forum. No more rumours, no more leaked internal documents. It's happening.

One consequence of the plan is an increase in the number of trains using Praed Street Junction and Edgware Road. The article mentions a proposed solution - run half of the District Line's services to Edgware Road only as far as High Street Kensington. However this will only be possible off-peak when demand is lower.

The timescale - like everything else in London - is to have it ready by 2012.

Update: I've just had another read of the article, and they say they could introduce it as early as December 2009.

Sunday, 25 May 2008

London Underground S stock plan [possibly] modified

The subsurface lines (District, Circle, Metropolitan, Hammersmith & City) are all due to have their trains replaced by S Stock from 2009-2015, which will feature air-conditioning and walk-through connections between carriages. The first two trains are already under construction.

The plan was to replace the elderly trains on the Metropolitan Line first like-for-like with 8 car trains, followed by 7 car trains on all the other lines. Since the Hammersmith & City and Circle lines currently use 6 car trains, some platforms would need extending and many sidings could no longer be used. The TfL board papers have consistently mentioned "affordability issues" with resolving this issue.

That brings us to an article in the latest issue of Modern Railways which claims the plan has been scrapped. Instead the Hammersmith & City and Circle Lines will be first to get the new stock because - according to MR - the H&C is due to become a "major Olympic artery". They'll be delivered as 6 car trains with the 7 car upgrade looked at again after the Olympics. The Metropolitan Line will be next to get new trains (possibly only 7 cars to begin with due to the needed "infrastructure improvements") and finally the District Line will get its 7 car trains.

No source is given, though it's implied the changes are part of the re-negotiated contract with Bombardier (who are building the S Stock) that follows the collapse of Metronet. On the other hand, Bombardier themselves announced agreement had been reached without these changes back on April 1st, a claim that's even repeated on page 46 of the same magazine.

And if it means anything, District Dave's prjb (one of the people at LU designing the trains with Bombardier) says the prototype train is 8 cars long, No word yet from him about the article.

Sunday, 13 April 2008

The new Circle Line: a diagram

I've made a diagram of the new Circle Line, so it's clearer what the proposal is and what issues it causes (click to enlarge).
I've included the other lines and their frequencies. As I understand it, each service on the network runs at roughly 7 trains per hour (tph), so that trains align when they meet at junctions. Hence one line on my map represents one 7 tph service, and the overall line thickness where they run alongside each other represents the total frequency on that section of track. I'm assuming that apart from the changes to the Circle, there'll be no significant changes to other lines.

You can see how there'll be double the number of trains on the branch to Hammersmith, but it also illustrates the big downside, which is the separation of the north and west sides of the [present] Circle Line. All trains from High Street Kensington terminate at Edgware Road, and all trains on the north side go to Hammersmith or up the Metropolitan Line, with none going towards High Street Kensington.

The major operation concern: the number of trains running over the flat junction at Praed Street, which will increase by a third because Circle Line services go over it twice on each journey.

Thursday, 20 March 2008

How Bank-Monument works

Since I made my maps of Green Park and King's Cross St. Pancras I knew it was only a matter of time before I had a crack at Bank-Monument. And here's what I've come up with:


There are several other maps available, but I wanted to do something a bit more detailed and geographically accurate that could be reconciled with the actual experience of traipsing through the tunnels.

Notes, disclaimers and things learnt during this exercise:
  • This was made entirely by visual observation on a handful of short visits, with no accurate charts used save an aerial photo to get the general shape right. It's entirely possible it's hilariously wrong.
  • The DLR really is slightly offset from the Northern Line and not quite parallel to it as shown. It's not me making my drawing easier.
  • From shallowest to deepest the levels are: Ticket halls, District/Circle Line, Waterloo & City Line, upper interchange level, Central Line, lower interchange level, Northern Line and DLR.
  • The route from end to end via the DLR rather than the Northern Line isn't actually much longer, it just involves a stupidly high number of bends and transitions.
  • The Waterloo & City Line platforms have a tiny newsagent hidden in a cross passage. Is it the only deep[-ish] level station so blessed?
  • The complex is so vast it has a whole other tube station within its thrall (Cannon Street).
  • The lift access from street to the DLR requires using three separate lifts, two of which are in the peak hours only ticket hall.
  • I have no idea what shape the Bank ticket hall really is.
  • For extra anorak points I've included the platform numbers and escalator numbers - I've heard the guy on the tannoy (it appears the same one works there 24/7) use the latter to refer to the escalators under repair.
This long easter weekend, why not use the diagram to try to work out what on earth today's rambling TfL press release about escalator closures is trying to say.